Completed projects

Equipment supply:

2024:

Supply of KEMP systems:

  • 220 kV overhead power line "Iskonnaya - Ermak";
  • 110 kV overhead power line "Shchebzavod - Airport";
  • 500 kV power line "Bely Rast - Beskudnikovo";

2023:

Supply of high voltage equipment and work:

  • Substation 500 kV "Ust-Kut" | Supply of 500 kV VT and CT, 500 kV gas-insulated tank circuit breakers (+ installation);
  • Substation 750 kV "Leningradskaya" | Supply and control of 750 kV VT type VCU-765;

Supply of KEMP systems:

  • 220 kV overhead line “Taiga – Malmyzh”;
  • 500 kV power line "Ust-Ilimsk Hydroelectric Power Station - Ust-Kut No. 3";
  • 220 kV power line "Severobaikalskaya - Kichera";
  • 110 kV power line "TEC-1 - Chernovskaya";
  • 220 kV power line "Chita - Ozernaya";
  • 500 kV overhead line “Ochakovo – CHPP-26”;
  • 500 kV power line "Nizhneangarskaya - Ust-Kut";
  • 220 kV power line "Abalakovskaya - Gorevsky Mining and Processing Plant - Razdolinskaya";
  • 110 kV overhead line “Gornaya – Kosach”;
  • 220 kV power line "Priangarskaya - Razdolinskaya";
  • KVL 110 kV “Aerodrom – SK-2”;

2022:

Supply of high voltage equipment and work:

  • Substation 500 kV "Ust-Kut" | Supply of 500 kV VT and CT, 500 kV gas-insulated tank circuit breakers (+ installation);
  • Substation 220 kV "Rassol" | Supply of 500 kV VT and CT, 500 kV gas-insulated tank circuit breakers (+ installation);

Delivery of KEMP systems:

220 kV power line "Pechora State District Power Plant - Ukhta - Mikun";

330 kV Lomonosovskaya power line

500 kV overhead line “Ochakovo – CHPP-26”;

500 kV power line "Nizhneangarskaya - Ust-Kut";

Leningradskoye PMES (PS 750 kV "Leningradskaya");

Supply of BIPRON grounding:

PP 500 kV "Chemical Plant";

2021:

Supply of lighting systems for KEMP supports for the needs of Slavneft-Krasnoyarskneftegaz LLC;

Supply of lighting systems for KEMP power transmission towers under the title "External power supply of the Severo-Komsomolskoye field. 110 kV overhead power line from the 220/110/10 Arsenal substation to the 110/35/10 kV Severo-Komsomolskaya substation", Novy Urengoy area;

Supply of lighting systems for KEMP supports under the title of 220 kV overhead power line "Pechora State District Power Plant - Ukhta - Mikun";

Supply of lighting systems for KEMP supports under the title "110 kV Krasnogorskaya - Strogino 1 overhead power line";

Supply of lighting systems for KEMP supports under the title "330/110 kV Lomonosovskaya PS with 330 kV LNPP - Zapadnaya PS";

Supply of lighting systems for KEMP supports under the title "500 kV overhead power line Noginsk-Chagino";

Supply of lighting systems for KEMP type supports for the 110 kV Vykatnaya-Erginskaya overhead power line;

Supply of lighting systems for KEMP type supports for JSC RUSSAIR (330 kV overhead power line Vostochnaya PS – Oktyabrskaya PS);

2020:

Supply of lighting systems for KEMP type supports under the title "220 kV Minusinskaya-support Koshurnikovo-traction - Sayanskaya traction - Kamala 1 overhead power line" (large transition);

Supply of lighting systems for KEMP type supports under the title “220 kV power line Peleduy - Sukhoi Log, 220 kV power line Sukhoi Log - Mamakan”;

Supply of lighting systems for KEMP type supports under the title "Construction of the 330 kV Artem-Derbent overhead power line and reconstruction of the 330 kV Artem substation";

2019:

Supply of lighting fencing systems for KEMP-type towers for the needs of the Leningradskoye PMES branch of PJSC FGC UES;
Supply of lighting fencing systems for KEMP-type towers under the title "220 kV Minusinskaya-opornaya Koshurnikovo-tyagovaya - Sayanskaya tyagovaya - Kamala 1 overhead power line";
Supply and installation of lighting fencing systems for KEMP-type towers for the needs of Novocherkasskaya GRES;
Supply and installation of lighting fencing systems for KEMP-type towers under the title "Reconstruction of the 220 kV Vyshesteblievskaya - Buzhora overhead power line with the formation of the 220 kV Vyshesteblievskaya - Gostagaevskaya overhead power line and the 220 kV Gostagaevskaya - Buzhora overhead power line for connecting the 220/27.5/10 kV substation Gostagaevskaya";
Supply of a 750 kV capacitive voltage transformer of the VCU-765 type to the 750 kV Belozerskaya substation;
Supply and supervision of installation of 330 kV capacitive voltage transformers at the 330 kV Putkinsky distribution point and the 330 kV Ondsky distribution point under the title "Construction of the 330 kV overhead line Kola NPP - Knyazhegubskaya HPP - 330/110/35 kV Louhi - Putkinskaya HPP - 330 kV outdoor switchgear of the Ondskaya HPP" for the needs of the branch of PJSC FGC UES MES North-West;
Supply and installation of lighting fencing systems for supports of the KEMP type on supports US500-V and U2 (S2) - Utu + 25 of the high-voltage line "500 kV overhead line Donskaya NPP - Stary Splinter No. 2";

2018 г.:

Supply and installation of lighting systems for KEMP type supports on the 330 kV Pulkovskaya-Yuzhnaya overhead line;
Supply of 330 kV voltage transformers of the VCU-362 type and a device for taking oil samples at the 330 kV Starorusskaya substation;
Supply of an autonomous power supply complex for low-power consumers "KEMP" on supports of the PP500, U2 type under the title: "500 kV Rostovskaya-Andreevskaya-Vyshesteblievskaya (Taman) overhead line";

2017:

Substation 500 kV "ZapSib" (PS 500/110 kV) (as part of the construction of the "West Siberian Complex for Deep Processing of Hydrocarbon Raw Materials (HCR) into Polyolefins with a Capacity of 2.0 Million Tons per Year with the Corresponding Off-Plant Facilities (OPF)":
Supply of 110 kV 100 MVA transformers for GPP-1, GPP-2;
Supply of 500 kV switches;
Supply of 500 kV capacitive and electromagnetic voltage transformers;
Supply of 500 kV current transformers;
Supply of 500 kV surge arresters.

2016 г.:

330 kV substation “Mashuk” (MES South);

2015:

Substation 110 kV "Industrial" (Uzlovsky Industrial Park);
Russian Railways (Kuibyshev Railway);

2014 г:

220 kV substation "Sotnik" (MES of Western Siberia);
330 kV substation "Velikoretskaya" (MES of the North-West);
500 kV substation "Magistralnaya" (MES of Western Siberia);

2009-2013 гг.:

500 kV substation "Amurskaya" (MES Vostova);
220 kV substation "Airport" (JSC FGC UES - MES East);
220 kV distribution point "Makkaveevo" (JSC FGC UES - MES Siberia);
330 kV substation "Kingiseppskaya" (MES North-West);
220 kV distribution point "Chernomorsky" (MES of the South);
330 kV distribution point "Putkinsky" (MES of the North-West);
330 kV distribution point "Ondsky" (MES of the North-West);
220 kV substation "Goryachiy Klyuch" (MES of the South);
220 kV substation "Shepsi" (MES South);
220 kV substation "Psou" (MES South);
PS 330 kV "Chudovo" (MES North-West);
PS "Kulitskaya" (October Railways of JSC "Russian Railways");
PS "Detskoye Selo" (October Railways of JSC "Russian Railways");
PS "Kolchanovo" (October Railways of JSC "Russian Railways");
PS "Cholovo" (October Railways of JSC "Russian Railways");
PS "Antropshino" (October Railways of JSC "Russian Railways");
PS "Kalashnikovo" (October Railways of JSC "Russian Railways");
PS "Andreevo" (October Railways of JSC "Russian Railways");
PS "152 km" (October Railways of JSC "Russian Railways");
PS "Pontonnaya" (October Railways of JSC "Russian Railways");
PS "Voskresensk" (Moscow Railways of JSC "Russian Railways");
PS "Zhukovka" (Moscow Railway of JSC "Russian Railways");

Works:

2017:
Provision of services for the supply and supervision of installation of clamp insulators for high-frequency communication on VCU-765 voltage transformers at the 750 kV Leningradskaya substation;

2015:

Major repairs of power transformers of Yerevan HPP-I (Republic of Armenia):
supply of equipment;
major repairs of power transformers;
installation of new equipment;
commissioning works.
Supervision of installation of electrical equipment (750 kV capacitive voltage transformers type VCU-765) at the outdoor switchgear of Kursk NPP;

2014:

Dismantling of two TMN-6300/110 transformers at the 110/10 kV Novaya substation.
and other facilities of JSC FGC UES

From 1994 to 2009, employees of JSC MEK carried out the procurement and construction of the following facilities:

Substations:

  • Substation 750 kV "Leningradskaya" (MES North-West)
  • 750 kV Substation "Cherepovetskaya" (MES Center)
  • Substation 750 kV "Bely Rast" (MES Center)
  • Substation 750 kV "Gribovo" (MES Center)
  • Substation 500 kV "Khekhtsir" (MES East)
  • Substation 500 kV "Beskudnikovo" (MES Center)
  • Substation 500 kV "Ochakovo" (MES Center)
  • Substation 500 kV "Chagino" (MES Center)
  • Substation 500 kV "Lipetskaya" (MES Center)
  • 500 kV Lozovaya Substation (MES East)
  • Substation 500 kV "Far East - Vladivostok" (MES East)
  • Substation 500 kV "Aluminum" (MES Siberia)
  • Substation 500 kV "Frunzenskaya" (MES Center)
  • 500 kV Arzamasskaya Substation (MES Central)
  • Substation 500 kV "Nizhegorodskaya" (MES Center)
  • Substation 500 kV "Zapadnaya" (MES Center)
  • Substation 500 kV "Zvezda" (MES Center)
  • Substation 500 kV "Frolovskaya" (MES South)
  • Substation 500 kV "Tikhoretskaya" (MES South)
  • Substation 500 kV "Krymskaya" (MES South)
  • Substation 330/400 kV "Vyborgskaya" (North-West Main Electric Networks)
  • Substation 330 kV "Kolpino" (MES North-West)
  • Substation 330 kV “Chudovo” (MES North-West)
  • Substation 330 kV "Yuzhnaya" (North-West Main Electric Networks)
  • Substation 330 kV "Kalininskaya" (MES Center)
  • Substation 330 kV "Novgorodskaya" (MES of the North-West)
  • Substation 330 kV "Knyazhegubskaya" (MES of the North-West)
  • Substation 330 kV "Loukhi" (North-West Main Electric Networks)
  • Substation 330 kV "Chesmenskaya" (MES North-West)
  • Substation 330 kV "Rzhevskaya" (MES of the North-West)
  • Substation 330 kV "Vostochnaya" (MES North-West)
  • Substation 330 kV "Tsentralnaya" (MES North-West)
  • Substation 220 kV "RC" (MES East)
  • Substation 220 kV "Vologda-Yuzhnaya" (MES Central)
  • 220 kV Substation "Michurinskaya" (MES Center)

Lines:

  • 220 kV power line "Staraya Russa-Novgorod" (MES North-West)
  • 330 kV power line "Yukki-Vyborgskaya-State Border" (MES North-West)
  • 750 kV overhead line "Kalinin NPP - Cherepovetskaya substation" (MES Center)
  • 500 kV overhead line "Bureyskaya HPP - substation "Khabarovskaya" with a crossing across the Amur and the Amur channel (MES of the East)
  • Fiber-optic communication line Moscow – Chelyabinsk – Khabarovsk (JSC Rostelecom)
  • 500 kV overhead line "Kurgan - Kozyrevo" (MES Urals)
  • 500 kV overhead line “Volgodonsk NPP – Substation “Nevinnomysk” (MES South)
  • 220 kV power line "Murovlenkovskaya-Tarko-Sale" (Western Siberian Main Electric Networks)
  • CL 330 kV "Yuzhnaya CHPP-Tsentralnaya" (MES North-West)
  • CL 220 kV "CHP 27-Khlebnikovo" (MES North-West)
  • 220 kV power line "Far East-Vladivostok" (MES East)

Photo gallery of projects